Copper One Resources Corp. Completes Third Drill Hole in Phase 2 Program at Majuba Hill Project

Vancouver, BC – November 16, 2026 – Leads & Copy – Copper One Resources Corp. announced the completion of drill hole MHB-41, the third hole in its 2026 Phase 2 diamond drilling program at its Majuba Hill Copper-Silver-Gold Project in Pershing County, Nevada. The program is designed to drill up to 10,000 feet on the company's 100%-owned flagship property.

MHB-41 reached a final downhole depth of 1,850 feet (564 metres). Preliminary geological core logging identified pervasive silicification with fine-grained pyrite and chalcopyrite, tourmaline breccia at multiple depths, and fracture coatings of hematite and tenorite. These observations are intended to provide additional geological information for the company's ongoing evaluation of alteration and mineralization at Majuba Hill.

The hole was drilled on a grid azimuth of 075° at an inclination of -50°. Core samples from approximately 580–581 feet showed pervasive silicification with fine-grained pyrite and chalcopyrite. Tourmaline breccia was observed in core-box intervals of 808.0–817.6 feet and 1,066.7–1,076.3 feet, characterized by angular, pale-coloured clasts within a dark matrix. At 1,261 feet (384 metres) downhole, the core displayed fracture coatings of hematite and tenorite.

Drill holes MHB-39, MHB-40, and MHB-41 together account for 4,925 feet (1,501 metres) of completed diamond drilling in Phase 2 to date. The company stressed that all depths are downhole, intervals cited for tourmaline breccia photographs represent full core-box intervals and do not establish continuous mineralized widths. Mineral identifications are preliminary field observations and do not determine metal grades or establish economic mineralization, nor should they be considered a substitute for laboratory assay results. No laboratory assay results from MHB-41 are being reported in this news release; any material analytical results will be disclosed following receipt, quality assurance/quality control review, and evaluation by the company's Qualified Person.

David Greenway, President and Chief Executive Officer of Copper One, stated, “Completion of MHB-41 marks another important step in our 2026 Phase 2 drilling program at Majuba Hill. The preliminary geological observations, including silicification, sulfide minerals and tourmaline breccia, provide additional information as our technical team continues to evaluate the project's geological characteristics.”

Greenway added, “Majuba Hill remains central to our North American copper exploration strategy. We are focused on systematic drilling, disciplined geological interpretation and advancing our understanding of the mineralized system. Laboratory assays and further technical evaluation will be essential in determining the significance of these observations and guiding future exploration.”

The expanded Phase 2 diamond core drilling program comprises up to 10,000 feet (3,048 metres) of HQ/PQ diamond core drilling. The program is intended to accelerate systematic testing of priority targets at Majuba Hill and support the company's objective of advancing the Project toward an inaugural mineral resource estimate prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. More than 95,000 feet (28,956 metres) have been drilled to date at Majuba Hill across more than 100 drill holes.

The Phase 2 program includes an initial drilling scope of approximately 5,000 feet (1,524 metres) contracted to Evolve Exploration Nevada, LLC (“Evolve”) using one portable HQ/PQ core drill. Continuous, two-shift drilling operations are planned 24 hours a day, seven days a week. The maximum planned hole depth under the initial scope is approximately 1,850 feet (564 metres). Evolve’s drill rigs operate on EVX Connect, Evolve’s real-time operational platform, through which Copper One expects to receive live drilling metrics, digital Progressive Logs of Drilling, drill-hole coordinate tracking, streamlined invoicing, and high-quality photographs of drill core.

Majuba Hill is Copper One Resources Corp.'s flagship copper-silver-gold exploration project, located in Pershing County, Nevada, USA. Nevada ranked first globally on the Investment Attractiveness Index in the Fraser Institute’s Annual Survey of Mining Companies 2025. The property comprises approximately 9,684 acres (3,919 hectares) and is situated approximately 70 miles (113 road kilometres) southwest of Winnemucca and 156 miles (251 kilometres) northeast of Reno. The project benefits from excellent infrastructure, including year-round road access, nearby electrical power and water, and access to a skilled mining workforce.

Majuba Hill is a past-producing copper mine with an extensive exploration database, including records from historical and recent drilling programs. Exploration has outlined a large copper-silver-gold hydrothermal mineralized system that remains open for expansion. Current exploration is focused on advancing the company's geological model through systematic drilling, geological mapping, geochemical sampling, and structural interpretation to evaluate the scale, continuity, and significance of mineralization. Additional drilling and technical studies will be required to further define the extent and economic potential of the mineralized system.

The scientific and technical information contained in this news release has been reviewed and approved by Larry Segerstrom, M.Sc. (Geology), CPG, a non-independent consulting geologist to the Company and a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Copper One Resources Corp. is focused on identifying, acquiring, and advancing high-potential copper, copper-silver-gold, and copper-molybdenum projects. The company's flagship asset is the Majuba Hill Copper-Silver-Gold District. Copper One also owns a 100% interest in the Redonda Copper-Molybdenum Project in British Columbia, holds an option to earn up to a 100% interest in the Redhill Property in British Columbia, and owns a 100% interest in the Sport Project in Utah.

Source: Copper One Resources Corp.